>
HOME SERVICES ABOUT BLOG SERVICE AREAS CAREERS CONTACT
Author Profile
Devin Martinez — CTO & Partner, Draftech International

Devin Martinez

CTO & Partner — Draftech International

LinkedIn Profile

Education, Experience & Certifications

Devin leads Draftech's technical operations and engineering team infrastructure — building the capacity and workflows that allow 600+ engineers to deliver OSP design at scale across all 50 U.S. states.

Education

Miami Dade College
Miami, FL

OSP Operations Leadership

Oversees Draftech's engineering operations and technical delivery — managing the systems, processes, and team structure that support OSP design programs across all 50 U.S. states.

Workforce & Talent Strategy

Leads engineering recruitment, onboarding, and team scaling at Draftech — with direct experience navigating the OSP workforce shortage affecting BEAD-funded fiber programs nationwide in 2025–2026.

Technical Expertise

Deep knowledge of make-ready engineering workflows, OTMR qualification processes, OSP fielding cost structures, strand mapping procedures, and the partner selection criteria ISPs use when choosing engineering firms.

Partner Selection Advisory

Advises ISPs, carriers, and BEAD subgrantees on how to evaluate and select OSP engineering partners — contract structures, capacity requirements, quality controls, and the red flags that indicate delivery risk.

Project Scope

Supported delivery across 44,000+ miles of fiber network design and 2.6M+ addresses passed — managing the engineering operations backbone that powers Draftech's programs across all 50 U.S. states.

Draftech International — Certified MBE

What Devin Writes About

Devin's writing focuses on the operational side of fiber deployment — make-ready processes, workforce challenges, engineering partner selection, and the field operations decisions that determine project outcomes.

Make-Ready Engineering Timelines

Why make-ready creates invisible schedule delays in fiber deployments — and the process changes, sequencing decisions, and utility coordination strategies that actually fix the problem.

Read: Make-Ready Engineering Timelines →

One-Touch Make-Ready (OTMR)

What qualifies for OTMR under FCC rules, what doesn't, and the practical limitations that determine whether OTMR actually speeds up your make-ready process in the field.

Read: OTMR for Fiber Guide →

Choosing an OSP Engineering Partner

The evaluation criteria that matter when selecting an OSP engineering firm — capacity, quality controls, delivery track record, and the contract structures that protect ISPs and subgrantees from delivery risk.

Read: How to Choose an OSP Partner →

Fiber Workforce Shortage & BEAD

The OSP engineering workforce shortage affecting BEAD-funded deployments in 2025–2026 — root causes, regional severity, and how ISPs and subgrantees can structure engineering engagements to maintain delivery capacity.

Read: Workforce Shortage & BEAD 2026 →

OSP Fielding Cost Per Mile

What ISPs actually pay per mile for OSP fielding in 2026 — cost ranges by terrain, density, and scope; the variables that drive estimates up; and how to evaluate fielding proposals from engineering firms.

Read: OSP Fielding Cost Per Mile →

Strand Mapping & Aerial Plant Assessment

The field process for strand mapping and aerial plant assessment — what crews collect, how data accuracy determines design quality downstream, and the common field capture failures that create change orders.

Read: Strand Mapping Field Process →

Articles by Devin Martinez

Operational guides on OSP engineering — make-ready, workforce strategy, partner selection, and field operations — from Draftech's CTO managing delivery across all 50 U.S. states.

Make-Ready Engineering Timelines: Why Your Fiber Build Is 6 Months Behind Before It Starts

How make-ready engineering creates invisible delays in fiber deployments and the process changes that actually fix the problem at the source.

Read Article →

One-Touch Make-Ready for Fiber: What Qualifies, What Doesn't, and What It Actually Changes

The FCC's OTMR rules explained by an engineer who works in make-ready daily — what qualifies, the practical limitations, and whether OTMR actually speeds your project up.

Read Article →

How to Choose an OSP Engineering Partner for Your Fiber Build

The criteria that actually matter when selecting an OSP engineering firm — capacity, quality controls, delivery history, and contract structures that protect your project.

Read Article →

Fiber Construction Workforce Shortage Is the Real BEAD Risk in 2026

The OSP engineering talent gap threatening BEAD deployment timelines — root causes, regional severity, and how subgrantees can structure engineering engagements to stay on track.

Read Article →

OSP Fielding Cost Per Mile: 2026 Pricing Guide for Fiber ISPs

What ISPs actually pay for OSP fielding in 2026 — cost ranges by terrain, access, and project scope, plus the variables that consistently blow estimates over budget.

Read Article →

Strand Mapping and Aerial Plant Assessment: The Field Process That Makes or Breaks Design

What strand mapping crews actually collect, how data quality downstream design accuracy, and the field capture failures that generate the most construction change orders.

Read Article →

Work With Draftech on Your Fiber Project

Draftech International delivers full-service OSP engineering across all 50 U.S. states — make-ready, design, fielding, and construction packages. Reach out to discuss your program requirements.

info@draftech.com